The Triton Knoll OFTO is a transmission asset connecting the 857MW Triton knoll Offshore wind farm to the mainland grid
The Triton Knoll Transmission Assets include two offshore substations, two 220kV subsea export cable circuits (approximately 50km in length), which connect to two onshore cable circuits (of approximately 57km in length), one onshore substation, and two 400kV export cable circuits connecting the onshore substation to the National Grid Bicker Fen onshore substation.
The WTGs are connected via strings of 66kV array cables to two 66kV/220kV Offshore Substation Platforms (OSP) (East and West) which are supported by monopile foundations. From the OSPs, two 220kV subsea export cables with a length of approximately 50km from the OSPs to shore join the onshore cables at the Transition Joint Bay (TJB).
EDS HV Group's (EDS) mission is to help the renewables industry maximise its high voltage network availability and capabilities. The company has gained extensive experience through working at over 60 wind farms - onshore and offshore
Visit EDS HV GroupEMS provides top quality management services in the renewables, infrastructure and real estate sectors. We offer exceptional value for money by charging fees that are competitive whilst going the extra mile to help our clients to optimise the performance of their investments. EMS has six offices in the UK and is now an international business with teams in Italy and Ireland. EMS has 192 employees and looks after assets that are worth £2.52bn.
Visit EMS3rd Floor (South)